LPG filling equipment
Filling machines, carousels and container plants fill LPG cylinders through manual or automatic heads.
View sourceLPG filling systems, plant support and plastic-conversion technology
Private to you. Nothing is shared with MAKEEN Energy A/S automatically.
Filling machines, carousels and container plants fill LPG cylinders through manual or automatic heads.
View sourcePalletisers, conveyors and robots move cylinders through filling and loading operations.
View sourceScales, leak detectors and valve testers check cylinder contents and condition before dispatch.
View sourceControllers, power distribution, electrical installations and fire/gas detection support LPG plant operation.
Cylinder identification, orientation, evacuation, washing and sealing prepare cylinders before and after filling.
View sourceCylinder-reconditioning equipment supports repair, cleaning, inspection, marking, pressure testing and valve replacement.
View sourceTank yards, piping, LPG transfer and plant utilities connect bulk supply with cylinder filling.
Plastcon systems convert suitable plastic-waste mixtures into oil and other outputs.
Engineering, project coordination and operational assessments support plant development and improvement.
Contract maintenance, modernization and facility operation.
View sourceSpecialized parts, kits and everyday plant consumables.
View sourceInstrumentation, metering, telemetry and gas detection support gas-system measurement and monitoring.
View sourceValves, pumps, compressors, hoses, couplings and loading equipment control and transfer gas.
View sourceVaporizers, autogas equipment, storage components and accessories support gas applications.
View sourcePrice on request
Restore and adapt LPG machinery
Price on request
Build operator and maintenance skills
Price on request
Operate and maintain customer plants
Price on request
Planned and resident maintenance
Price on request
Collect and interpret operating data
Price on request
Engineering and system integration
Price on request
Coordinate engineering and commissioning
Price on request
Plan critical spare-parts inventory
SIMAM-CI
A four-day assessment in May 2023 examined SIMAM-CI’s plant flow, working practices and equipment maintenance. An improvement report led to a resident maintenance agreement.
Arch Holdings
The Newgas plant for Arch Holdings received a 36-post line for 6–14 kg cylinders, an 8-post line for 3 kg cylinders, a large-cylinder station and a refurbishment line, plus electrical and compressed-air installations. Delivery took place in 2023 and operation began in early 2024.
Butagaz
Replacement of 28 filling machines at Aubigny, with Danish controller/load-cell development, French mechanical engineering/project management and Sri Lankan production. Prototype work began in 2023 and the complete carousel started in early 2024.
Boehlke Bottled Gas
A 12-post carousel, check scale and conveyors were combined with a Vision code reader adapted to QR and data-matrix identification for database-driven cylinder sorting at Boehlke Bottled Gas.
MAKEEN’s India and Denmark teams developed a combined quality controller for weighing, leak detection and pressure testing, using new parallel-control software.
Westfa
FAS Germany designed, built and supplied a 40-foot mobile filling container for Westfa’s September 2025 Detmold upgrade. Six filling machines, a check scale, leak detector and evacuation unit maintained cylinder filling during four weeks of work on the main plant.
ISO 9001:2015
ExVeritas 20ISO0141 names MAKEEN Energy at Alsvej 21. Scope includes LPG/LNG-system design, procurement, manufacturing and installation, and power-system engineering/construction/maintenance. Stated validity 17 December 2023–16 December 2026. The document names MAKEEN Energy at the Randers address.
UK quality assurance notification
ExVeritas 23UKQAN0317, issue 3; reassessed 5 December 2025, valid until 16 December 2026. Randers and the scheduled France, Sri Lanka and Germany sites; scheduled power barriers, enclosures, interfaces, leak detectors and load-cell modules.
EU quality assurance notification
ExVeritas 23PQAN0316, issue 3, dated 5 December 2025; valid until 16 December 2026. Randers applicant with scheduled manufacturing in France, Sri Lanka and Germany; EN ISO/IEC 80079-34:2018 quality system under Directive 2014/34/EU.
IECEx quality assessment report
GB/EXV/QAR23.0001/02, issued 9 March 2026, valid until 16 December 2026. Scheduled Randers, France, Sri Lanka and Germany sites and the report’s listed equipment/protection concepts.
PED Module D1 quality-system approval
TÜV Rheinland Polska 01 2627 IN/Q-260008.00; MAKEEN Energy A/S as manufacturer, Lanka manufacturing plant. Valid 15 June 2026–14 June 2029 for the specified carbon-steel piping and swivel/distributor components.
LPG filling and cylinder-maintenance systems are supplied alongside plant engineering, operational support, gas equipment and Plastcon plastic-conversion technology. The MAKEEN Energy business was formed in 2015 and is headquartered in Randers. Danish and international engineering, production and service teams deliver the portfolio through MAKEEN Energy and its separately incorporated Gas Solutions and Gas Equipment businesses.
Chain conveyors
Claim this profile to review and manage its public information.
Tradebird created this profile from public sources. MAKEEN Energy A/S has not reviewed or endorsed it.
Updated Sep 13, 2026